| Passport |
|
Budget |
| Country: |
|
Bangladesh |
|
total: |
|
€ 8346.00 |
| Project number: |
|
5802 |
|
|
|
|
| Project title: |
|
Integrated Education and Treatment for the Visually Impaired or Blind Children in Savar. |
|
|
|
|
| Category: |
|
Education |
|
|
|
|
| Partner: |
|
Bangladesh Blind Mission |
|
|
|
|
|
Organisation mission statement The organizational vision of the BBM is to see that the basic rights of the disabled people partricularly the visual disabled persons have been well established. In order to achief this vision the mission of the BBM is to create, promote and support the opportunity for treatment, training, education, rehabilitation and job, etc. and for the visually disabled people and thus assist them to be established in the main stream of the society.
Target group (i) The visually impaired or VI (both blind and low vision) children in rural and remote areas Savar under Dhaka District most of which are from the families of below proverty level and have not received any proper medical check up and necessary treatment for their visual disability and thus have no access to the formal education in any locall normal or special (not available in the project area) schools are the target group of the proposed project. (ii) A number of VI children already got access to education after necessary medical check up and treatment, basic rehabilitation training and preschool training under the same type of project during the previous years and are now in need of education support for the continuation of their studies, become the target group of the proposed project.
Project purpose With the proposed project we want to reach that in long term the children in the proposed project area (Savar area) most of which are of the families below proverty level are not becoming visually impaired or blind due to ignorance or lack of awareness and absence of proper eye care services upto their reach and capabilities and thus the cause of blindness has been reduced to almost nill in Savar area. The VI childeren already existing in the families in different parts of the area after receiving proper medical treatment and inclussive education are no longer considered as burden to each of their families or to the society. besides, each of them become educated and independant earning members in their families as well as in the society. The local normal and elite people in the area become more cooperative and helpful to the existing VI children and adults in the development activities of these VI persons in their areas.
Targets Description
- 20 Potential VI children in Savar area after being identified, received proper medical check up and treatment,
basic rehabilitation and pre school trainings, are successfully integrated into local normal schools or classes at the end of the project year 2010.
- 103 VI children in Savar area some of which are already integrated into local normal schools and some are in the
home studies by the BBM straff members and volunteers upto the year 2009 and also those VI children being prepared through pre school training and are waiting at homes for admission into the schools at the end of the year 2009 or begining of the year 2010 have to continue their studies with the education support and teaching guidance from the project during the project year(2010) and at the end of the project year at least 80% of them successfully promoted to their respective next classes or grades.
- 10 New school teachers of the local normal schools in Savar area particularly the new schools in which the VI
children were integrated for their formal education, have been trained under fresh and refreshers' training course on how to deal with these VI children in their classes for reading, writing and apearing in the examinations and assist them to continue their studies in the class rooms and at homes in all respect so that at the end of the project year 2010 at least 80% of these VI students are successfully promoted to their next
- 10 New local normal schools in the area where the VI children were already integrated have been provided with
proper education materials and equipments for the use of the class teachers as well as the VI students so that at the end of the project year at least 80% of the VI children are successfully promoted to next grades.
- 4 Project staff members of the project have been provided with both basic and refreshers' training on their
respective roles and duties in the project so that their professional skills have been improved to achieve the main target of the project in the project year 2010.
- 1 sensitization workshop has been arranged with the stack holders, Government and /nongovernment
organisation representatives, local leaders and other elite people on the proposed project purposal and distribution of posters, hand bills, leaflets etc. to creat peoples awareness, and realization on the blindness prevention activities in the Savar Area.
- 1 Annual reunion or get together at the end of the year has been arranged with the proposed project staff
members and beneficiaries (VI children) along with the staff members of other projects of BBM to celebrate year ending and pre Christmas festival.
- 1 Learning workshop with all the concerned project staff members, school teachers, parents or gaurdians, local
government oficials and other NGO representatives in the area has been organized to share the experiences, capacity as well as weakness individually or in groups, to overcome the shortfall or weakness and thus improve the capacity and willingness for the services towards the VI children and adults under the project.
|